Accession Number : AD0640812

Title :   PRE-MISSION PREPARATION OF FLARE, AIRCRAFT, PARACHUTE, MK 24, ALL MODS WITH SAFETY LANYARD RETROFIT.

Descriptive Note : Technical note,

Corporate Author : FRANKFORD ARSENAL PHILADELPHIA PA AMMUNITION DEVELOPMENT AND ENGINEERING LABS

Personal Author(s) : Grandy,A. J.

Report Date : SEP 1966

Pagination or Media Count : 28

Abstract : A field method is described for retrofitting existing MK 24 flares with a 50-foot safety lanyard in order to increase fuze arming distance when these flares are manually launched from the interior of fixed or rotary wing aircraft. (Author)

Descriptors :   (*PARACHUTE FLARES, PREPARATION), (*AIRCRAFT FLARES, PREPARATION), SAFETY, ARMING DEVICES, LAUNCHING

Subject Categories : Pyrotechnics

Distribution Statement : APPROVED FOR PUBLIC RELEASE