Accession Number : AD0737198

Title :   Project Pre-Gondola III Phase III: Connection of a Row Crater to a Reservoir,

Corporate Author : ARMY ENGINEER EXPLOSIVE EXCAVATION RESEARCH OFFICE LIVERMORE CALIF

Personal Author(s) : Redpath,Bruce B.

Report Date : AUG 1971

Pagination or Media Count : 25

Abstract : Project Pre-GONDOLA III Phase III, the connection of a row crater to a reservoir, was executed on 6 October 1969 and was the culmination of several years of cratering experiments in saturated clay shale near Fort Peck, Montana. This experiment used a total of 70 tons of an aluminized ammonium nitrate blasting agent in a row of five charges to remove a barrier between an existing row crater and the Fort Peck Reservoir. The excavation resulting produced by the detonation had a volume of about 63,000 cubic yards. The blasting agent appears to have a cratering effectiveness approximately 1.6 times that of TNT. (Author)

Descriptors :   (*ROCK, CRATERING), (*NUCLEAR EXPLOSIONS, SIMULATION), EXPLOSIVE CHARGES, NITROGEN COMPOUNDS, METHANE, NUCLEAR INDUSTRIAL APPLICATIONS, CIVIL ENGINEERING, INLAND WATERWAYS, MONTANA

Subject Categories : Geology, Geochemistry and Mineralogy