Accession Number : AD0748918

Title :   Contract End Item Detail Specification (Prime Equipment). Part I. Performance/Design and Qualification Requirements. Test Position, Purge, Fill, and Leak.

Corporate Author : HUGHES AIRCRAFT CO CANOGA PARK CALIF

Report Date : 24 AUG 1972

Pagination or Media Count : 16

Abstract : The specification established the requirements for performance, design, test, and qualification of one model of equipment, identified as purge, fill, and leak test position. This CEI provides for depot level testing of the MAVERICK guidance units. (Author)

Descriptors :   (*AIR TO SURFACE MISSILES, MAINTENANCE), (*CHECKOUT EQUIPMENT, SPECIFICATIONS), TELEVISION GUIDANCE, TEST EQUIPMENT, ENVIRONMENTAL TESTS, MAINTAINABILITY, QUALITY CONTROL

Subject Categories : Test Facilities, Equipment and Methods
      Air- and Space-launched Guided Missiles

Distribution Statement : APPROVED FOR PUBLIC RELEASE