Accession Number : AD0756858

Title :   Test Instrumentation Subsystem Integration Test Program Requirements,

Corporate Author : BOEING CO SEATTLE WASH

Personal Author(s) : Douglas,Y. C.

Report Date : 15 JUL 1963

Pagination or Media Count : 18

Abstract : The report presents the requirements for integration tests which are a part of the design qualification testing of the Test Instrumentation Subsystem (TIS). The tests are termed, 'integration tests', since they will be performed as the individually qualified subcontractor and Boeing manufactured units are integrated in stages to the subsystem. These requirements will also apply to integration tests performed during acceptance tests of operational subsystems. The measure of performance in the majority of tests will be data accuracy and acceptable performance will be based on the accuracies specified in the measurement list. Total subsystem accuracies will be determined by modifying the accuracies obtained in test in such a way as to include transducer and signal source accuracies.

Descriptors :   (*LIFTING REENTRY VEHICLES, TEST METHODS), AEROSPACE CRAFT, INSTRUMENTATION, CHECKOUT EQUIPMENT, CHECKOUT PROCEDURES

Subject Categories : Unmanned Spacecraft

Distribution Statement : APPROVED FOR PUBLIC RELEASE