Title :   Construction Time Overruns.

Descriptive Note : Technical rept.,

Corporate Author : ARMY CONSTRUCTION ENGINEERING RESEARCH LAB CHAMPAIGN ILL

Personal Author(s) : Halpin,D. W. ; Neathammer,R. D.

Report Date : AUG 1973

Pagination or Media Count : 78

Abstract : The actual time required to complete construction on military facilities is often greater than the time contractually specified. There are several reasons for these 'overruns' or time extensions: designer changes/errors, user changes, weather, strikes, late deliveries, etc. These time extensions were studied by examining a sample of contracts throughout CONUS from the time period July 1967 - June 1970. Based on the 221 contracts evaluated it is estimated that for an average contract, an additional 27% of the specified construction time will be allowed as time extensions. (Author)

Descriptors :   (*CONSTRUCTION, *TIME STUDIES), (*MILITARY FACILITIES, *CONTRACTS), LANDING FIELDS, BUILDINGS, ARMY PROCUREMENT, REGRESSION ANALYSIS, ANALYSIS OF VARIANCE

Subject Categories : Administration and Management
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE