Accession Number : AD0768098

Title :   CMP Instructions, Specifications, and Example.

Descriptive Note : Technical rept.,

Corporate Author : ARMY CONSTRUCTION ENGINEERING RESEARCH LAB CHAMPAIGN ILL

Personal Author(s) : Johnson,E. R.

Report Date : SEP 1973

Pagination or Media Count : 108

Abstract : The problem was to develop a construction scheduling model for the Army Functional Component System (AFCS) which could be used by engineers in the field, theater-of-operation planners, and base development planners. To fulfill this requirement a Facility Scheduling Model and an Installation Tabulation Model were developed. Also included are instructions for architects and engineers and an example of the model. The Installation Tabulation Model duration was compared with duration derived by the CERL Construction Management Procedure (CMP) Computer Simulation Model. The comparison results in a recommended 1.35 multiplication factor for the Installation Tabulation Model. (Author)

Descriptors :   (*CONSTRUCTION, *SCHEDULING), (*MILITARY FACILITIES, CONSTRUCTION), LOGISTICS, CONSTRUCTION MATERIALS, EARTH HANDLING EQUIPMENT, TIME STUDIES, PLANNING, MANAGEMENT PLANNING AND CONTROL, COMPUTER PROGRAMS

Subject Categories : Construction Equipment, Materials & Supplies
      Logistics, Military Facilities and Supplies