Accession Number : AD0775824

Title :   Project Trinidad: Explosive Excavation of Railroad Cuts 2 and 3 by Mounding and Directed Blasting.

Descriptive Note : Final technical rept.,

Corporate Author : ARMY ENGINEER WATERWAYS EXPERIMENT STATION LIVERMORE CALIF EXPLOSIVE EXCAVATION RESEARCH LAB

Personal Author(s) : Lattery,Jerome E.

Report Date : JAN 1974

Pagination or Media Count : 37

Abstract : The report summarizes the objectives, design, and results of two explosive excavation experiments performed as the final phase of Project Trinidad, a comprehensive series of tests to determine the cratering properties of interbedded sandstones and shales. The experiments were performed in September 1971 by the U.S. Army Engineering Waterways Experiment Station Explosive Excavation Research Laboratory. These final experiments were designed to excavate through-cuts for relocation of the Colorado and Wyoming Railroad at the Trinidad Dam and Lake Project. The first of the two experiments tested a charge array designed to break up material within a 19,000-cubic yards cut to facilitate later removal of the material by mechanical means. The concept tested was mounding, a blasting technique in which charges are positioned with respect to the horizontal ground surface rather than a vertical bench face. (Modified author abstract)

Descriptors :   *Railroads, *Construction, *Explosions, *Excavation, *Cratering, Explosive charges, Emplacement, Blast, Ground motion, Experimental design

Subject Categories : Civil Engineering
      Explosions