Accession Number : AD0824198

Title :   DEVELOPMENT OF PRODUCTION PROCESSES FOR AN ADAPTER SYNTHESIZER WITH TIME SCALE SELECTION.

Descriptive Note : Final rept. Jun 64-Aug 67,

Corporate Author : GENERAL TECHNOLOGY CORP LOS ANGELES CA

Personal Author(s) : Beltran, Richard D.

Report Date : NOV 1967

Pagination or Media Count : 23

Abstract : Quality-quantity production processes were developed for an adapter synthesizer capable of meeting or exceeding minimum specified performance requirements under airborne and ground environmental conditions. A prototype synthesizer design was reviewed and revised to incorporate a time scale selection capability. A manufacturing plan was developed based on a production capability of 30 to 50 units per month. Three prototype units were constructed, tested, and delivered to the government for complete environmental testing, which the units passed successfully. A performance specification based on the prototype design was prepared and was approved by the government. Twenty units meeting the approved specification were then fabricated, tested, and delivered. Satisfactory test results led to the conclusion that program objectives were achieved with the development and production of an adapter synthesizer meeting the specified requirements.

Descriptors :   *MANUFACTURING), (*FREQUENCY SYNTHESIZERS, AIRBORNE, GROUND SUPPORT EQUIPMENT, MODULES(ELECTRONICS), PRINTED CIRCUITS, CRYSTAL OSCILLATORS, VOLTAGE CONTROLLED OSCILLATORS, HIGH FREQUENCY, QUALITY CONTROL, PRODUCTION, TIME, SCALE, SELECTION.

Subject Categories : Electrical and Electronic Equipment
      Mfg & Industrial Eng & Control of Product Sys

Distribution Statement : APPROVED FOR PUBLIC RELEASE