Accession Number : AD0830199

Title :   VALIDATION PROCEDURE FOR THE FACILITY POWER CONTROL SYSTEM (ELECTRICAL) 'D' SERIES R AND D, ERB 1-1,

Corporate Author : GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Personal Author(s) : Eggert, A. L.

Report Date : 10 OCT 1958

Pagination or Media Count : 14

Abstract : This procedure determines that the electrical control equipment and circuitry of the Facility Power Control System is functioning correctly and properly connected. (Author)

Descriptors :   (*SURFACE TO SURFACE MISSILES, GROUND SUPPORT EQUIPMENT), (*GROUND SUPPORT EQUIPMENT, POWER SUPPLIES), CHECKOUT PROCEDURES, STANDBY GENERATORS, DIESEL ENGINES, CONTROL PANELS, VOLTAGE, BATTERY COMPONENTS, ELECTRIC BATTERIES, RECTIFIERS, CIRCUIT BREAKERS, POWER TRANSFORMERS.

Subject Categories : Guided Missile Launching and Basing Support
      Surface-launched Guided Missiles

Distribution Statement : APPROVED FOR PUBLIC RELEASE