Accession Number : AD0830572

Title :   VALIDATION PROCEDURE FOR THE FACILITY POWER CONTROL SYSTEM (ELECTRICAL) 'D' SERIES R AND D SYCAMORE S-1,

Corporate Author : GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Personal Author(s) : Eggert, A. L.

Report Date : 30 JUL 1958

Pagination or Media Count : 15

Abstract : This manual provides instructions for validating the Facility Power Control System (Electrical). The procedure determines that the electrical control equipment and circuitry of the Facility Power Control System is functioning correctly and properly connected. (Author)

Descriptors :   *TEST FACILITIES), *CONTROL SYSTEMS), (*SURFACE TO SURFACE MISSILES, (*POWER SUPPLIES, ELECTRICAL EQUIPMENT, INSTRUCTION MANUALS, TEST METHODS, SEQUENCES(MATHEMATICS), OPERATIONAL READINESS, CIRCUITS, GROUND SUPPORT EQUIPMENT, CONTROL PANELS.

Subject Categories : Guided Missile Launching and Basing Support
      Surface-launched Guided Missiles

Distribution Statement : APPROVED FOR PUBLIC RELEASE