Accession Number : AD0830825

Title :   VALIDATION PROCEDURE FOR THE FIREX CONTROL SYSTEM (ELECTRICAL) 'D' SERIES R AND D, SYCAMORE S-1,

Corporate Author : GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Personal Author(s) : Eggert, A. L.

Report Date : 30 AUG 1958

Pagination or Media Count : 14

Abstract : This procedure determines that the electrical control equipment and circuitry of the Firex Control System is functioning correctly and properly connected. (Author)

Descriptors :   *CHECKOUT PROCEDURES), (*SURFACE TO SURFACE MISSILES, LAUNCHING SITES), (*CONTROL SYSTEMS, ELECTRICAL EQUIPMENT, FIRING CIRCUITS, ELECTRIC SWITCHES, CONTROL PANELS, POWER SUPPLIES, SEQUENCES(MATHEMATICS), GUIDED MISSILE LAUNCHERS, LAUNCH VEHICLES, COOLING.

Subject Categories : Guided Missile Launching and Basing Support

Distribution Statement : APPROVED FOR PUBLIC RELEASE