Accession Number : AD0833195

Title :   PRE-PRODUCTION (QUALIFICATION) TEST REQUIREMENTS PURGE SYSTEM LOCAL CONTROL BOX AND ELECTRICAL CONTROL UNIT FOR ATLAS 'D' IOC,

Corporate Author : GENERAL DYNAMICS/ASTRONAUTICS SAN DIEGO CA

Personal Author(s) : Beye, W. R.

Report Date : 25 SEP 1959

Pagination or Media Count : 23

Abstract : The purpose of this document is to establish test requirements for pre-production (qualification) testing of the purge system local control box and the purge system electrical control unit. The basic intent of these tests is to determine that the equipment functions properly when subjected to environmental test conditions simulating actual conditions of transportation, handling and use. (Author)

Descriptors :   (*PROPELLANT TRANSFER, CONTROL SYSTEMS), (*ELECTRICAL EQUIPMENT, RELIABILITY(ELECTRONICS)), TEST METHODS, TEST EQUIPMENT, GROUND SUPPORT EQUIPMENT, ENVIRONMENTAL TESTS, TEMPERATURE, HUMIDITY, ALTITUDE, VIBRATION, SHOCK(MECHANICS), THERMAL SHOCK, SALT SPRAY TESTS, TRANSPORTATION, STORAGE, SURFACE TO SURFACE MISSILES.

Subject Categories : Electrical and Electronic Equipment
      Surface-launched Guided Missiles
      Liquid Rocket Propellants

Distribution Statement : APPROVED FOR PUBLIC RELEASE