Accession Number : AD0918445

Title :   Developmental Test II (DT II). Communication Technical Control Center AN/TSQ-84.

Descriptive Note : Final rept. 1 May-31 Dec 73,

Corporate Author : ARMY ELECTRONIC PROVING GROUND FORT HUACHUCA AZ

Personal Author(s) : Wagner, Walter E.

Report Date : MAR 1974

Pagination or Media Count : 192

Abstract : The circuit patching facilities presently fielded are not adequate to perform all the functions required at area and large command signal centers. These patching facilities lack necessary four-wire interconnection capacity, line test and monitor facilities, and adequate space and facilities for operating personnel. The Communication Technical Control Center AN/TSQ-84 is being developed to fulfill this need and replace the outdated Communications Patching Panel SB-675A/MSC. The AN/TSQ-84 will be fielded as a one-for-one replacement of the SB-675A/MSC to signal units that receive the Army Tactical Area Communications System (ATACS) High Capacity System equipment.

Descriptors :   *COMMUNICATIONS CENTRALS, *RADIO RELAY SYSTEMS, *INTERCOMMUNICATION SYSTEMS, PORTABLE SHELTERS, VOICE COMMUNICATIONS, INTERFACES, TEST METHODS, ACCEPTANCE TESTS, MAINTAINABILITY, HUMAN FACTORS ENGINEERING, SHOCK RESISTANCE, VIBRATION, RELIABILITY(ELECTRONICS), ELECTROMAGNETIC COMPATIBILITY, ELECTROMAGNETIC INTERFERENCE, FREQUENCY RESPONSE, ELECTRIC WIRE, TELETYPE SYSTEMS, NETWORKS, ELECTRIC CABLES, INSERTION LOSS.

Subject Categories : Radio Communications
      Voice Communications

Distribution Statement : APPROVED FOR PUBLIC RELEASE