Accession Number : ADA118771

Title :   System Engineering Analysis of Air Conditioning, Heating, and Ventilation Systems Installed on LHA-1 and LPH-2 Class Ships,


Personal Author(s) : O'Connor,J M

PDF Url : ADA118771

Report Date : Jul 1982

Pagination or Media Count : 76

Abstract : The analysis documented herein is specifically applicable to the Air Conditioning, Heating, and Ventilation Systems--ship's work authorization boundary (SWAB) groups 511-1, 512-1, 513-1, 514-1, 514-2, and 514-3-- installed on LHA-1 and LPH-2 Class ships. The analysis considers only the systems and equipments installed and the documentation effective as of 22 April 1981. This system was selected for analysis by PERA (ASC) on the basis of its mission criticality and historical maintenance burden. (Author)

Descriptors :   *Marine engineering, *Air conditioning equipment, *Heating, *Ventilation, *Ships, Systems engineering, Environmental engineering, Systems analysis, Ventilators, Cooling and ventilating equipment, Shipboard, Performance(Engineering), Maintenance management, Preventive maintenance, Parts, Corrosion inhibition

Subject Categories : Air Condition, Heating, Lighting & Ventilating
      Marine Engineering

Distribution Statement : APPROVED FOR PUBLIC RELEASE