Accession Number : ADA132440

Title :   Operating and Support Cost Estimating Guide. Sample Analysis Navy Ship at DSARC II.

Corporate Author : COST ANALYSIS IMPROVEMENT GROUP WASHINGTON D C

PDF Url : ADA132440

Report Date : 01 Jan 1980

Pagination or Media Count : 32

Abstract : Operating and Support (O&S) costs for the V/STOL and Spruance class destroyers (DD963) are provided. These figures are compared to the figures presented to the DSARC at Milestone I. Annual operating and support costs of the Air Detachment are not included in this report. The costs growth reflected in both the V/STOL and DD963 class destroyer is due mainly to the rise in POL costs from $1.25 per gal. to $1.32 per gal., plus a slight rise in manpower requirements. The Spruance class destroyer was selected as the baseline due to similarities of most ship systems and size. It does not reflect the system being replaced. The V/STOL destroyer is a new concept to meet expanding commitments.

Descriptors :   *Cost models, *Cost estimates, *Destroyers, Operation, Logistics support, Naval logistics, Base lines, Short takeoff aircraft, Vertical takeoff aircraft, Petroleum products, Manpower, Cost analysis, Costs, Mathematical models, Instructions, Data bases

Subject Categories : Economics and Cost Analysis
      Marine Engineering
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE