Accession Number : ADA134022

Title :   Mississippi River: Study of Alternatives for Rehabilitation of Lock and Dam Number 1. Minneapolis, Minnesota. Volume 2. Appendix A. Alternative Plans of Rehabilitation.

Descriptive Note : Design memo.

Corporate Author : CORPS OF ENGINEERS ST PAUL MN ST PAUL DISTRICT

PDF Url : ADA134022

Report Date : Apr 1976

Pagination or Media Count : 76

Abstract : It is recommended that both the landward lock, the riverward lock and the dam at Lock & Dam no. 1, Minneapolis, Minnesota be completely rehabilitated. Based on studies completed to the date of this report, more detailed studies are required to firmly establish cost estimates, environmental effects, and the construction scheduling necessary to insure the work can be completed in the proposed two year construction period without delaying navigation. This Appendix discusses: Plan 1, Rehabilitation of Landward Lock Without Interruption of Navigation; Plan 2, Rehabilitation of Landward Lock with Temporary Use of Riverward Lock for Navigation; Plan 3, Rehabilitation of Landward Lock with Navigation Closed During Construction; and Plan 4, Rehabilitation of Both Locks Without Interruption of Navigation.

Descriptors :   *Locks(Waterways), Minnesota, Mississippi River, Dams, Rehabilitation, Construction, Scheduling, Cost estimates

Subject Categories : Civil Engineering

Distribution Statement : APPROVED FOR PUBLIC RELEASE