Abstract : This report provides the Task 3 deliverables for an EMCS Installation Follow-Up study. The objective of this study is to provide data on experience at existing EMCS installations for use in developing guidelines for better implementation of EMCS. Section 2.0 of this report provides a list of probable causes for EMCS success/failure identified in previous studies. Section 3.0 discusses whether or not recommendations made in the Kings Bay study have been implemented and how effective those actions have been in addition to discussing areas not previously addressed. Section 4.0 provides a summary list of recommendations which are based on current conditions as found during the course of this project. Section 5.0 provides Exhibits referenced in Section 1.0 through 4.0. All Appendices are bound separately as Volume II of this report.

Descriptors :   *Energy conservation, Naval Shore facilities, Buildings, Heating plants, Air conditioning equipment, Monitoring, Control systems, Installation

Subject Categories : Air Condition, Heating, Lighting & Ventilating