Accession Number : ADA180699

Title :   Demolition/Salvage Analysis of Offshore Platforms. Stage I and II.

Descriptive Note : Preliminary rept. no. 2.

Corporate Author : BARNETT AND CASBARIAN INC METAIRIE LA

Report Date : JUN 1983

Pagination or Media Count : 59

Abstract : Stage I is a 16 pile platform installed in 100 ft. of water approximately 12 miles offshore Panama City, Florida. Stage II is a 9 pile platform installed in 60 ft. of water approximately 1.5 miles offshore. BCI's responsibility for this project includes identifying promising alternatives; inspecting platforms and taking inventory of materials; determining applicable laws and regulations; providing cost estimated; and making recommendations. A Pre-design Meeting was held at the Naval Coastal Systems Center (NCSC) in Panama City, Florida on April 18, 1983 to discuss the project. The two offshore platforms were inspected on April 19, 1983 and the equipment on the platforms at that time was recorded. The preliminary report presents the principal alternatives for disposal and the evaluation of the most feasible alternatives. For each alternative, the pros and cons are listed as well as estimated cost, a summary of permit requirements, a list of navigational and environmental impacts, and pertinent laws and regulations.

Descriptors :   *PLATFORMS, *OFFSHORE STRUCTURES, *UNDERWATER STRUCTURES, COST ESTIMATES, DEMOLITION, DISPOSAL, ENVIRONMENTAL IMPACT, FLORIDA, MATERIALS, OFFSHORE, SALVAGE, MEXICO GULF, INSPECTION

Subject Categories : Structural Engineering and Building Technology