Accession Number : ADA215998

Title :   Installation Restoration Program. Stage 1. King Salmon Airport , King Salmon, Alaska. Appendixes A-J.

Descriptive Note : Final technical rept.

Corporate Author : CH2M HILL ANCHORAGE AK

Report Date : 29 AUG 1989

Pagination or Media Count : 662

Abstract : The objective of the Air Force Installation Restoration Program (IRP) is to assess past hazardous waste disposal and spill sites on Air Force installations and develop remedial actions consistent with the National Contingency Plan (NCP) for those sites which pose a threat to human health and welfare or the environment. The intent is to conduct the remedial investigation and feasibility study in parallel, where feasible, instead of in serial fashion. Stage 1 of the IRP process at King Salmon AFS AK include: literature search; determination of public health and environmental requirements; Field investigation; Qualitative risk assessment; Scoping and initial screening of remedial actions; Development of data quality objectives (DQOs); and preparation of a final report. Keywords: Well logs; Soil gas and geophysical investigations. (RH)

Descriptors :   *HAZARDOUS MATERIALS, *SPILLING, *WASTE DISPOSAL, *ENVIRONMENTAL IMPACT, *ENVIRONMENTAL MANAGEMENT, *CONTAMINATION, *POLLUTION ABATEMENT, AIR FORCE FACILITIES, ALASKA, DATA MANAGEMENT, DETERMINATION, ENVIRONMENTS, FEASIBILITY STUDIES, GASES, GEOPHYSICS, HEALTH, HUMANS, LITERATURE SURVEYS, PUBLIC HEALTH, QUALITY, RECORDS, REQUIREMENTS, RISK, SITES, SOCIAL WELFARE, SOILS, THREATS, WELL LOGGING, RECLAMATION.

Subject Categories : Environmental Health and Safety
      Solid Wastes Pollution and Control

Distribution Statement : APPROVED FOR PUBLIC RELEASE