Accession Number : ADA288940

Title :   Final Decision Document for the Interim Response Action for the Groundwater Intercept and Treatment System, North of Basin F, Rocky Mountain Arsenal.

Corporate Author : ROCKY MOUNTAIN ARSENAL DENVER CO

PDF Url : ADA288940

Report Date : DEC 1988

Pagination or Media Count : 89

Abstract : The specific objectives of the interim response action for the ground water intercept and treatment system North of Basin F are to initiate capture of the contaminated alluvial aquifer water from below Basin F, collect operational data on the interception, treatment, and recharge of contaminated ground water in this area that will aid in the design of a final response action. This proposed decision document provides summaries of alternatives considered, significant events leading to the initiation of the IRA, the IRA Project, the applicable or relevant and appropriate requirements (ARAR's). The preferred system will consist of withdrawal wells, carbon adsorption filters, and recharge wells.

Descriptors :   *WATER TREATMENT, *GROUND WATER, *INSTALLATION RESTORATION, *ENVIRONMENTAL PROTECTION, ADSORPTION, ARMY FACILITIES, CARBON, ALLUVIUM, AQUIFERS, BIOLOGICAL CONTAMINATION, OXIDATION, BARRIERS, EXTRACTION, FILTERS, AIR QUALITY, WASTE MANAGEMENT, ROCKY MOUNTAINS, HAZARDOUS WASTES, POLLUTION ABATEMENT, SITE INVESTIGATIONS, HYDRAULICS, EMISSION CONTROL, NOISE POLLUTION, COLORADO, WATER WELLS.

Subject Categories : Logistics, Military Facilities and Supplies
      Air Pollution and Control
      Noise Pollution and Control
      Solid Wastes Pollution and Control
      Water Pollution and Control

Distribution Statement : APPROVED FOR PUBLIC RELEASE