Accession Number : ADA289097

Title :   Litigation Technical Support and Services, Rocky Mountain Arsenal Offpost Remedial Investigation/Feasibility Study.

Descriptive Note : Final technical plan,

Corporate Author : ENVIRONMENTAL SCIENCE AND ENGINEERING INC ENGLEWOOD CO

PDF Url : ADA289097

Report Date : JUL 1988

Pagination or Media Count : 267

Abstract : The objective of this task is to conduct a remedial investigation and feasibility study off-post of RMA. This RI/FS will: (1) evaluate the extent of contamination to the north and northwest of the arsenal, (2) estimate the risk to the environment and public health, (3) identify appropriate remedial responses. Sections of the report discuss the following: (1) geotechnical and chemical analysis, (2) ground water sampling, (3) safety plan for field activities, (4) data management and evaluation of data, (5) ea methodology which will be required in order to determine the magnitude and probability of actual or potential harm to the public or the environment.

Descriptors :   *WATER TREATMENT, *GROUND WATER, *POLLUTION ABATEMENT, *INSTALLATION RESTORATION, BOREHOLES, AQUIFERS, BIOLOGICAL CONTAMINATION, DRAINAGE, SURFACE WATERS, QUALITY CONTROL, SANDSTONE, EXPOSURE(PHYSIOLOGY), ROCKY MOUNTAINS, HAZARDOUS WASTES, SITE INVESTIGATIONS, ENVIRONMENTAL PROTECTION, LAND USE, PUBLIC HEALTH, COLORADO, WATER WELLS, PESTICIDES, LITIGATION.

Subject Categories : Logistics, Military Facilities and Supplies
      Water Pollution and Control
      Environmental Health and Safety

Distribution Statement : APPROVED FOR PUBLIC RELEASE