Accession Number : ADA290176

Title :   Water Treatment at Rocky Mountain Arsenal, Preoperational and Pilot Test Plan.

Corporate Author : ROCKY MOUNTAIN ARSENAL DENVER CO

Personal Author(s) : Welling, Richard

PDF Url : ADA290176

Report Date : 1976

Pagination or Media Count : 37

Abstract : This 10,000 GPH Water Treatment Plant Test Plan is designed to demonstrate the proper functioning of all equipment. This includes all mechanical and electrical systems checkouts, establishing and maintaining a carbon bed, and identifying any modifications desired to optimize the process. This is an interim facility designed to demonstrate the feasibility of removing DIMP and DCPD from water at a 10,000 GPH test unit. Included with this plan is the operators' checklist for water treatment facility, installation restoration program. BKA

Descriptors :   *WATER PUMPS, *WATER TREATMENT, *INSTALLATION RESTORATION, TEST AND EVALUATION, REMOVAL, ARMY FACILITIES, CARBON, DRAINAGE, FLOW RATE, FEASIBILITY STUDIES, PLANNING, FILTER ANALYSIS, PILOT STUDIES, ROCKY MOUNTAINS, EVAPORATION, SITE INVESTIGATIONS, BEDS(PROCESS ENGINEERING), PH FACTOR, COLORADO, WATER WELLS, IRRIGATION SYSTEMS, ENVIRONMENTAL ENGINEERING, WATER RECLAMATION, ION PUMPS.

Subject Categories : Pumps, Filters, Pipes, Tubing, Fittings & Vlvs
      Logistics, Military Facilities and Supplies
      Water Pollution and Control

Distribution Statement : APPROVED FOR PUBLIC RELEASE