Accession Number : ADA290406

Title :   Groundwater Intercept and Treatment System North of Rocky Mountain Arsenal, Interim Response Action.

Descriptive Note : Final rept.

Corporate Author : HARDING-LAWSON ASSOCIATES DENVER CO

PDF Url : ADA290406

Report Date : JUL 1989

Pagination or Media Count : 122

Abstract : The objectives of the Off-Post interim response action are to: (1) Continue ground water monitoring and provide an alternative drinking water supply (2) Mitigate migration of contaminants in alluvial ground water (3) Treat contaminated alluvial ground water. This final decision document provides summaries of: (1) Alternatives considered (2) Significant events leading to the initiation of the IRA (3) The IRA Project (4) The applicable or relevant and appropriate requirements, standards, criteria, and limitations (ARAR's) associated with the project. The selected IRA program will consists of: (1) Continued monitoring (2) Ground water extraction and recharge, but no physical barrier. -BKA

Descriptors :   *GROUND WATER, *WASTE DISPOSAL, *INSTALLATION RESTORATION, *ENVIRONMENTAL PROTECTION, METHODOLOGY, CHEMICAL CONTAMINATION, WASTE WATER, HYDROLOGY, GEOLOGY, DRINKING WATER, WATER TREATMENT, ACTIVATED CARBON, AQUIFERS, WATER POLLUTION, DRAINAGE, FLOW RATE, OXIDATION, SURFACE WATERS, EXTRACTION, PLUMES, SOIL POLLUTION, ROCKY MOUNTAINS, EVAPORATION, SITE INVESTIGATIONS, WETLANDS, WATER QUALITY, LAND USE, PUBLIC HEALTH, SOLID WASTES, TOPOGRAPHIC MAPS, OZONE LAYER, CHEMICAL ANALYSIS, CHANNELS(WATERWAYS), COLORADO, HAZARDOUS MATERIALS, WATER SUPPLIES, WATER WELLS, PESTICIDES, MICROORGANISMS.

Subject Categories : Hydrology, Limnology and Potamology
      Logistics, Military Facilities and Supplies
      Solid Wastes Pollution and Control
      Water Pollution and Control

Distribution Statement : APPROVED FOR PUBLIC RELEASE