Accession Number : ADA291580

Title :   South Plants, Site 1-10, Task 2, Draft Final Source Report.

Descriptive Note : Final draft rept.,

Corporate Author : EBASCO SERVICES INC LAKEWOOD CO

PDF Url : ADA291580

Report Date : OCT 1986

Pagination or Media Count : 105

Abstract : This draft final report documents the Phase I contamination survey of site 1-10, a storage tank farm constructed in 1942. 30 samples from 13 borings were analyzed for volatile and semivolatile organics and metals with separate analyses for HG, AS, and DBCP, C6H6, DCPD, DLDRN, CH2CL2, CU, CR, PB, HG, and ZN were detected in the samples. A Phase II program consisting of 15 additional sampling points is recommended. A soil gas program is also proposed for the site. The volume of potentially contaminated soil present is estimated at 88, 142 cubic feet. Appendices: Phase I analytical parameters, summary of chemical data. -BKA

Descriptors :   *HYDROLOGY, *BOREHOLES, *GROUND WATER, *SOIL POLLUTION, *WASTE TREATMENT, *SOIL SURVEYS, CHEMICAL CONTAMINATION, PARAMETERS, ARMY FACILITIES, GEOLOGY, DRAINAGE, CONSTRUCTION, SAMPLING, ORGANIC COMPOUNDS, ROCKY MOUNTAINS, STORAGE TANKS, SITE INVESTIGATIONS, WATER QUALITY, DESIGN CRITERIA, CHEMICAL ANALYSIS, COLORADO, WATER TABLE.

Subject Categories : Hydrology, Limnology and Potamology
      Soil Mechanics
      Solid Wastes Pollution and Control
      Water Pollution and Control

Distribution Statement : APPROVED FOR PUBLIC RELEASE