Accession Number : ADA292956

Title :   60% Design Cost Estimate Interim Action, Rocky Mountain Arsenal, Basin F.

Corporate Author : WOODWARD-CLYDE CONSULTANTS DENVER CO

PDF Url : ADA292956

Report Date : AUG 1987

Pagination or Media Count : 183

Abstract : This document includes cost estimates for the following: (1) Rip-rap removal; (2) grading; (3) clay for capping and lining; (4) waste pile select fill; (5) topsoil; (6) sumps and piping; (7) debris removal; (8) hauling waste; (9) solidication; (10) roads; (11) filters; (12) drainage net. (MM)

Descriptors :   *COST ESTIMATES, *WASTE DISPOSAL, *POLLUTION ABATEMENT, *LANDFILLS, *SOIL STABILIZATION, *EARTH HANDLING EQUIPMENT, DECONTAMINATION, ARMY FACILITIES, SOLIDIFICATION, PIPES, LININGS, SOILS, CLAY, CONTAMINANTS, ROADS, EXCAVATION, LEACHING, RUNOFF, COLORADO, SUMPS, CAPPING, LAGOONS(LANDFORMS), RIPRAP.

Subject Categories : Economics and Cost Analysis
      Soil Mechanics
      Civil Engineering
      Construction Equipment, Materials & Supplies
      Solid Wastes Pollution and Control

Distribution Statement : APPROVED FOR PUBLIC RELEASE