Accession Number : ADA294753

Title :   Project Completion Report For Department Of The Army, Contracting Division, Rocky Mountain Arsenal, Commerce City, Colorado.

Corporate Author : HARRISON WESTERN CORP DENVER CO

PDF Url : ADA294753

Report Date : 11 DEC 1985

Pagination or Media Count : 117

Abstract : This report details the procedures and equipment used in the closure of the deep injection well near basin F. Sections discuss the following: (1) Construction of the surface facilities associated with the well; materials and methods used in plugging the well. (2) Schedule, labor distribution, and contractor percentage of the work. (3) Decontamination procedures used for personnel and equipment. Appendices include: (1) Daily report sheets from Chen and associates. (2) Chemical sampling results for water, soil and air. (3) Certificates of post-employment medical examinations of personnel.

Descriptors :   *DECONTAMINATION, *SAMPLING, *HAZARDOUS WASTES, DISTRIBUTION, CHEMICALS, WATER, FACILITIES, REPORTS, SURFACES, SHEETS, LABOR, ARMY, DAILY OCCURRENCE, COLORADO.

Subject Categories : Solid Wastes Pollution and Control
      Environmental Health and Safety

Distribution Statement : APPROVED FOR PUBLIC RELEASE