Accession Number : ADA295551

Title :   Cutoff Walls and Cap for Lime and M-1 Settling Basins, Rocky Mountain Arsenal, Colorado. Part 1: Final Design Analysis.

Descriptive Note : Final rept.,

Corporate Author : ROCKY MOUNTAIN ARSENAL DENVER CO

PDF Url : ADA295551

Report Date : OCT 1990

Pagination or Media Count : 346

Abstract : This document consists of 2 parts: Final design analysis, and specifications. The purpose of the project was to develop a design for the Interim Response Actions (IRA) at the Lime and M-l Settling Basins at Rocky Mountain Arsenal (RMA), Commerce City, Colorado. The purpose of the IRA at the Lime and M-l Settling Basins is to mitigate the threat of release from the Basins on an interim basis, pending determination of the final remedy in the Onpost Record of Decision (ROD). The IRA for the M-l Basins also includes treatment of the waste materials in the basins with in-situ vitrification (ISV), which is being designed by contract with Woodward-Clyde Consultants. (MM)

Descriptors :   *WASTE WATER, *GROUND WATER, *WATER POLLUTION, *SOIL POLLUTION, *HAZARDOUS WASTES, *POLLUTION ABATEMENT, *INSTALLATION RESTORATION, *SOIL CLASSIFICATION, *GEOTECHNICAL ENGINEERING, METALS, PERMEABILITY, DECONTAMINATION, SPECIFICATIONS, HEALTH, ARMY FACILITIES, PAVEMENTS, TOPOGRAPHY, HYDROLOGY, GEOLOGY, BOREHOLES, HEAT TREATMENT, STRATIGRAPHY, SLURRIES, TRENCHES, DRAINAGE, FLOW RATE, SAFETY, WALLS, CONTAMINATION, SITE INVESTIGATIONS, ENVIRONMENTAL PROTECTION, VEGETATION, ARSENIC, WASTE TREATMENT, BASINS(GEOGRAPHIC), COLORADO, HAZARDOUS MATERIALS, WATER SUPPLIES, PESTICIDES, SLUDGE, DRILLING, HEAD(FLUID MECHANICS), BACKFILLS, CAPPING.

Subject Categories : Hydrology, Limnology and Potamology
      Soil Mechanics
      Solid Wastes Pollution and Control
      Water Pollution and Control
      Environmental Health and Safety