Accession Number : ADA302313

Title :   Installation Restoration Program, Construction Report for Interim Remedial Action and Treatability Study for Indian Mountain Long Range Radar Station, Alaska.

Descriptive Note : Final rept. 1 Aug 95-8 Dec 95.

Corporate Author : JACOBS ENGINEERING GROUP INC DENVER CO

PDF Url : ADA302313

Report Date : 11 DEC 1995

Pagination or Media Count : 58

Abstract : This Final Construction Report is provided under Contract No. F41624-94-D-8046-OOO4, between the U.S. Air Force and Jacobs Engineering Group Inc.The purpose of this report is to describe and detail the activities conducted as part of the Interim Remedial Action and Treatability Study at Indian Mountain Long Range Radar Station. Alaska. This report contains five sections. Section 1.0 provides introduction and background information, and describes general tasks completed. Section 2.0 describes the construction activities. section 3.0 presents the environmental sampling results and data evaluation for the two tasks. Conclusions and final recommendations are in Section 4.0. Section 5.0 lists references cited in the report. (AN)

Descriptors :   *WATER POLLUTION, *SOIL POLLUTION, *INSTALLATION RESTORATION, *CIVIL ENGINEERING, CHEMICAL CONTAMINATION, ALASKA, GROUND WATER, CONSTRUCTION, SURFACE WATERS, SAMPLING, AIR FORCE FACILITIES, ENVIRONMENTAL MANAGEMENT, WASTE MANAGEMENT, BIODEGRADATION, EXCAVATION, RADAR STATIONS, SEDIMENTS, DIESEL FUELS, FUEL CONTAMINATION, SOIL TESTS, CONCENTRATION(CHEMISTRY), MILITARY ENGINEERING, POLYCHLORINATED BIPHENYLS, OIL POLLUTION CONTAINMENT, DITCHES, WATER ANALYSIS.

Subject Categories : Soil Mechanics
      Water Pollution and Control
      Civil Engineering
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE