Accession Number : ADA302633

Title :   Rocky Mountain Arsenal Sanitary Sewer Interim Response Action Construction Documents for New Sanitary Sewer Construction. Volume 2.

Corporate Author : WESTON (ROY F) INC LAKEWOOD CO

PDF Url : ADA302633

Report Date : JAN 1990

Pagination or Media Count : 249

Abstract : The primary objective of this interim response action is to prevent the potential spread of contamination via the sanitary sewer system. The IRA will consist of (1) construction of a new sanitary sewer and (2) sealing of the existing sewer in the north plants and south plants areas along with the interceptor line in section 36. Sections of this draft implementation document include: (1) Procedures for sealing the existing sewer lines with concrete: (2) Schedule of closure events. (3) Discussion of ARAR'S. (4) Health and safety plan for closure of existing lines. (5) Specifications and plans for the new sanitary sewer. (6) Health and safety plan for the new sewer project.

Descriptors :   *CONSTRUCTION, *SEWERS, *SEWAGE DISPOSAL, *WASTES(SANITARY ENGINEERING), CONTRACTS, HEALTH, ARMY FACILITIES, LEAKAGE(FLUID), CONCRETE, PIPES, TRENCHES, SAFETY, GRAVITY, CATHODIC PROTECTION, WASTE DISPOSAL, CONTAMINATION, EXCAVATION, COLORADO, BACKFILLS.

Subject Categories : Construction Equipment, Materials & Supplies
      Solid Wastes Pollution and Control
      Environmental Health and Safety