Accession Number : ADA303447

Title :   Closure Plan for the Basin F Interim Response Action Structures.

Corporate Author : RUST ENVIRONMENT AND INFRASTRUCTURE INC DENVER CO

PDF Url : ADA303447

Report Date : SEP 1994

Pagination or Media Count : 98

Abstract : This document presents the Army's final closure plan for four basin F interim response action structures at RMA. These structures include Pond A, Pond B, the tank farm, and the submerged quench incinerator (SQI). Pond A, Pond B, and the tank farm were constructed to temporarily store liquid from basin F until a treatment and disposal method could be selected. The disposal method was later determined to be incineration in the SQI. Section 2 of this plan presents a general description of the RMA facility and the basin F IRA structures, section 3 presents a detailed discussion of the closure process and associated waste management, section 4 describes the anticipated schedule for closure of the basin F IRA structures, section 5 provides a contingency closure plan, and section 6 provides a list of references used in this document.

Descriptors :   *WATER POLLUTION, *SOIL POLLUTION, *WASTE DISPOSAL, *HAZARDOUS WASTES, *BASE CLOSURES, CLOSURES, DECONTAMINATION, WASTE WATER, MONITORING, HEALTH, ARMY FACILITIES, GEOLOGY, COMBUSTION, GROUND WATER, SAFETY, AIR QUALITY, WASTE MANAGEMENT, INCINERATORS, RUNOFF, HAZARDOUS MATERIALS, PESTICIDES, LIQUID WASTES, HYDROGEOLOGY.

Subject Categories : Logistics, Military Facilities and Supplies
      Solid Wastes Pollution and Control
      Water Pollution and Control
      Pesticides Pollution and Control
      Environmental Health and Safety

Distribution Statement : APPROVED FOR PUBLIC RELEASE