Accession Number : ADA303640

Title :   Installation Restoration Program, Remedial Investigation/Feasibility Study Report Addendum for Indian Mountain Long Range Radar Station, Alaska.

Descriptive Note : Final rept. 1 Aug-18 Dec 95,

Corporate Author : JACOBS ENGINEERING GROUP INC DENVER CO

Personal Author(s) : Karmi, Samer

PDF Url : ADA303640

Report Date : 19 DEC 1995

Pagination or Media Count : 148

Abstract : The Final RI/FS report addendum is provided under Contract No. F41624-94-D-8046-0004, between the U.S. Air Force Jacobs Engineering Group Inc. The purpose of this report is to describe field activities conducted in August 1995, evaluate analytical results from the sampling activities, and describe changes in conclusions or recommendations to the final RI/FS submitted in October 1995. The IRP source areas that were investigated are as follows: SS02, OT08, SS09, SS10, and SS11. These areas required additional characterization to complete the requirements of the RI/FS. The general objective was to characterize contaminant extent and concentrations at the five source areas listed above

Descriptors :   *GROUND WATER, *AIR FORCE FACILITIES, *SOIL POLLUTION, *INSTALLATION RESTORATION, RISK, CHEMICAL CONTAMINATION, TOXICITY, ALASKA, FEASIBILITY STUDIES, SURFACE WATERS, SAMPLING, FUEL TANKS, RIVERS, ENVIRONMENTAL MANAGEMENT, SITE INVESTIGATIONS, ENVIRONMENTAL PROTECTION, WATER QUALITY, CIVIL ENGINEERING, RADAR STATIONS, FUEL CONTAMINATION, SOIL TESTS, CONCENTRATION(CHEMISTRY), PHENOLS, WATER WELLS, ECOLOGY, MILITARY ENGINEERING, POLYCHLORINATED BIPHENYLS, WATER ANALYSIS.

Subject Categories : Soil Mechanics
      Water Pollution and Control
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE