Accession Number : ADA330283

Title :   Energy Engineering Analysis Program (EEAP). Energy Surveys of Army Central Heating and Power Plants. Volume I. Executive Summary, Fort Wainwright.

Corporate Author : GRAHAM (JOHN) CO SEATTLE WA

PDF Url : ADA330283

Report Date : APR 1986

Pagination or Media Count : 26

Abstract : This is the Executive Summary of the energy survey and project documentation that resulted from the Energy Survey of the Central Heating and Power Plant (CHPP) at Fort Wainwright. It is a part of the continuing effort under the Energy Engineering Analysis Program (EEAP). Similar energy surveys and reports have been developed for Fort Richardson and Fort Greely Central Heating and Power Plants concurrently. The Scope of Work of this program was developed by the Huntsville Division Corps of Engineers for use at all Army central heating and power plants. The purpose of this study is to review and study all potential energy conservation opportunities (ECOs) at the Port Wainwright Central Heating and Power Plant (CHPP). These ECOs would then be developed to determine the economics and feasibility of implementation. The equipment at this plant is over 30 years old. The plant is meeting the requirements of providing steam for heating the base. It is a functional operating plant that will, with proper maintenance and repairs, continue to perform for many more years. With a heating plant of this age there was reason to believe that many energy conservation opportunities do exist. Section 4 describes the ECOs found and studied.

Descriptors :   *SURVEYS, *ENERGY CONSERVATION, *HEATING PLANTS, COST ANALYSIS, ALASKA, FEASIBILITY STUDIES, ARMY CORPS OF ENGINEERS.

Subject Categories : Non-electrical Energy Conversion
      Air Condition, Heating, Lighting & Ventilating

Distribution Statement : APPROVED FOR PUBLIC RELEASE