Accession Number : ADA330325

Title :   UMCS Feasibility Study for Fort George G. Meade Volume 1

Descriptive Note : Feasibility study

Corporate Author : ENTECH ENGINEERING INC READING PA

PDF Url : ADA330325

Report Date : DEC 1996

Pagination or Media Count : 19

Abstract : Fort George G. Meade selected 83 buildings, from the approximately 1,500 buildings on the base to be included in the UMCS Feasibility Study. The purpose of the study is to evaluate the feasibility of replacing the existing analog based Energy Monitoring and Control System (EMCS) with a new distributed process Monitoring and Control System (UMCS).

Descriptors :   *ARMY FACILITIES, *ENERGY CONSERVATION, *ENERGY CONSUMPTION, COST EFFECTIVENESS, FEASIBILITY STUDIES, LIFE CYCLE COSTS, SAVINGS, REPAIR SHOPS, ELECTRIC POWER DISTRIBUTION, FUEL OIL, MILITARY ENGINEERING, WAREHOUSES, NATURAL GAS, OFFICE BUILDINGS, BARRACKS.

Subject Categories : Non-electrical Energy Conversion
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE