Accession Number : ADA330394

Title :   Basewide Energy Systems Plan, Fort Gordon, Georgia. Executive Summary.

Descriptive Note : Final rept.

Corporate Author : BLACK AND VEATCH KANSAS CITY MO

PDF Url : ADA330394

Report Date : JAN 1983

Pagination or Media Count : 32

Abstract : This is a summary of the results for Increments A, B, C, D, and E of the Basewide Energy Systems Plan for Fort Gordon, Georgia. (The results for Increments F and G are summarized on pages 5 through 7.) The plan includes analyses and recommendations of energy conservation projects for reduction of the installation's present energy consumption. The installation should be aware that savings figures presented in this summary can only be realized after all projects have been implemented. Black and Veatch has developed projects that would meet the funding requirements for the energy conservation program. Furthermore, the recommended projects provide partial compliance with the energy conservation requirements for the installation as outlined in the Army Facilities Energy Plan. This summary presents data on the following: Existing energy consumption, source energy reductions due to energy conservation techniques for buildings and their systems, application of solar energy to reduce fossil fuel consumption, savings utilizing central energy monitoring and control systems (EMCS), use of solid waste as an alternate energy source, analysis of Total Energy/Selective Energy (TE/SE) systems.

Descriptors :   *ARMY FACILITIES, *ENERGY CONSERVATION, *ENERGY CONSUMPTION, MONITORING, REDUCTION, SOLAR ENERGY, FUEL CONSUMPTION, SOLID WASTES, SAVINGS, GEORGIA, FOSSIL FUELS.

Subject Categories : Non-electrical Energy Conversion
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE