Accession Number : ADA330533

Title :   Energy Surveys of Army Central Heating and Power Plants. Energy Engineering Analysis Program (EEAP). Fort Greely. Volume 1, Executive Summary.

Descriptive Note : Executive summary.

Corporate Author : GRAHAM (JOHN) CO SEATTLE WA

PDF Url : ADA330533

Report Date : APR 1986

Pagination or Media Count : 31

Abstract : This is the Executive Summary of the energy survey and project documentation that resulted from the Energy Survey of the Central Heating and Power Plant at Fort Greely. It is a part of the continuing effort under the Energy Engineering Analysis Program (EEAP). Similar energy surveys and reports have been developed for Fort Richardson and Fort Wainwright Central Heating and Power Plants concurrently. The Scope of Work of this program was developed by the Huntsville Division Corps of Engineers for use at all Army central heating and power plants. Representatives from the Huntsville Division of the Corps, U.S. Army Forces Command (FORSCOM) and John Graham Company, Architect-Engineer visited the Fort Greely power plant during the summer of 1984. At that time, a generic Scope of Work was reviewed. From it, a detailed scope was developed for Fort Greely. A complete Scope of Work can be found in Appendix H Volume 4 of this report. The purpose of this study is to review and study all potential energy conservation opportunities (ECOs) at the Fort Greely Central Heating and Power Plant (CHPP). These ECOs would then be developed to determine the economics and feasibility of implementation. The equipment at this plant is over 30 years old. The plant is meeting the requirements of providing steam for heating the base. It is a functional operating CHPP plant that will, with proper maintenance and repairs, continue to perform for many more years. With a heating plant of this age there was reason to believe that many energy conservation opportunities do exist. Section 4 describes the ECOs found and studied. The study also required that the condition and efficiency of the boilers and auxiliaries of the entire plant be evaluated.

Descriptors :   *ARMY FACILITIES, *ENERGY CONSERVATION, *ENERGY CONSUMPTION, *ENERGY MANAGEMENT, ALASKA, STEAM, HEATING PLANTS, BOILERS.

Subject Categories : Non-electrical Energy Conversion
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE