Accession Number : ADA330625

Title :   Feasibility Study for Installation of UMCS, Fort Riley, Kansas. Energy Engineering Analysis Program (EEAP)

Descriptive Note : Final rept.

Corporate Author : EMC ENGINEERS INC DENVER CO

PDF Url : ADA330625

Report Date : DEC 1995

Pagination or Media Count : 472

Abstract : The objective of this report is to Feasibility Study for Installation of UMCS at Fort Riley was performed as part of the Energy Engineering Analysis Program (EEAP) for the Kansas City District Corps of Engineers. The purpose of this feasibility study is to determine the economic feasibility of replacing the existing UMCS with a Utility Monitoring and Control System (UMCS) and adding additional buildings to the UMCS. The existing pneumatic controls would be replaced with direct digital controls.

Descriptors :   *ADAPTIVE CONTROL SYSTEMS, *ARMY FACILITIES, *ENERGY CONSERVATION, DIGITAL SYSTEMS, VENTILATION, COST ESTIMATES, FEASIBILITY STUDIES, HEATING, ARMY CORPS OF ENGINEERS, AIR CONDITIONING EQUIPMENT, SAVINGS, ENERGY CONSUMPTION, PNEUMATIC EQUIPMENT, THERMOSTATS.

Subject Categories : Non-electrical Energy Conversion
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE