Accession Number : ADA330626

Title :   UMCS Feasibility Study, Attachment Sections 8.1 & 8.2 A thru D for Fort George Meade. Volume 2 of 3.

Corporate Author : ENTECH ENGINEERING INC READING PA

PDF Url : ADA330626

Report Date : AUG 1996

Pagination or Media Count : 659

Abstract : The existing Honeywell EMCS was originally installed in 1997. A software upgrade was performed five years ago; field hardware improvements were made in 1982. The existing EMCS is a standalone (monolithic) system. Over the years, mechanical and electrical equipment has become disconnected, losing monitor and control points. Purpose of this study is to evaluate replacement of the existing EMCS with a new, PC-based UMCS, and to evaluate adding new buildings to the UMCS. All buildings shall be prioritized according to simple payback and need.

Descriptors :   *ARMY FACILITIES, *ENERGY CONSERVATION, *ENERGY CONSUMPTION, *ELECTRICAL EQUIPMENT, *ENERGY MANAGEMENT, COMPUTER PROGRAMS, MARYLAND, BUILDINGS, FEASIBILITY STUDIES, MECHANICAL COMPONENTS.

Subject Categories : Non-electrical Energy Conversion
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE