Accession Number : ADA330682

Title :   Energy Engineering Analysis Program, Fort Sam Houston, Texas; Executive Summary.

Corporate Author : CRS GROUP INC HOUSTON TX

PDF Url : ADA330682

Report Date : APR 1984

Pagination or Media Count : 26

Abstract : The CR5 Group Inc. is pleased to submit this report on Increments C, F and G of the Energy Engineering Analysis Program (EEAP) for Fort Sam Houston, Texas. Increments A and B were completed and the final reports were submitted in October 1983. This work was accomplished under Contract No. DACA63-79-C-O192 with three modifications. The associated volumes, general contents, level of completion and contract modification numbers are listed in TABLE ESl. The EEAP at Fort Sam Houston has been completed under a variety of Modifications and associated Scopes of Work and ECIP Guidances. For example, the original contract work was done under the 5 November 1979 Scope of Work and 7 November 1977 ECIP Guidance, while Modification POOOO6 was completed using the 22 September 1982 Scope of Work and 31 December 1982 ECIP Guidance. This has resulted in projects being analyzed using energy to cost (E/C) and benefit to cost (B/C) ratios of varying minimums as well as Savings to Investment (SIR) ratios. Applicable analysis criteria is identified in each Volume.

Descriptors :   *COST ANALYSIS, *ARMY FACILITIES, *ENERGY CONSUMPTION, RATIOS, ENERGY, ELECTRICITY, ENERGY CONSERVATION, SAVINGS, TEXAS, PETROLEUM PRODUCTS, FUEL OIL, NATURAL GAS.

Subject Categories : Non-electrical Energy Conversion
      Logistics, Military Facilities and Supplies
      Economics and Cost Analysis

Distribution Statement : APPROVED FOR PUBLIC RELEASE