Accession Number : ADA331199

Title :   Update ECIP Package for Building P-300, White Sands Missile Range, New Mexico.

Descriptive Note : Final rept.

Corporate Author : EMC ENGINEERS INC DENVER CO

PDF Url : ADA331199

Report Date : 1993

Pagination or Media Count : 96

Abstract : In November 1992, an Energy Savings Opportunity Survey (ESOS) was completed by E M C Engineers, Inc. on several buildings at White Sands Missile Range. Building P-3OO was evaluated for the following eight Energy Conservation Opportunities (ECOs): Use more efficient lighting fixtures. Reduce lighting levels. Use recovered waste heat. Use dry bulb economizers. Reduce outside air quantities. Use thermal storage for demand reduction. Convert constant volume air handling systems to variable air volume. Consolidate multiple air-cooled chiller (loads) onto two high efficiency, water-cooled chillers.

Descriptors :   *ARMY FACILITIES, *ENERGY CONSERVATION, THERMAL PROPERTIES, EFFICIENCY, COOLING AND VENTILATING EQUIPMENT, NEW MEXICO, LIGHTING EQUIPMENT, ENERGY CONSUMPTION, AIR COOLED.

Subject Categories : Non-electrical Energy Conversion
      Logistics, Military Facilities and Supplies

Distribution Statement : APPROVED FOR PUBLIC RELEASE